Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Oct 17, 2022     Making replacement tube bracket - (1.0 hour)       Category: Fuel Tanks
I decided that I needed to fabricate a replacement for one of the vent tube brackets because the thickness of the edge of the bracket around the hole had become too thin during my smoothing of it. So I grabbed a piece of scrap material of similar thickness, traced out a new one, cut it out, and cleaned it up on the sander. A final fitment check confirms it'll work.

What's next? Time to install the fuel filler caps.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.